Indian Customer -5MW 20MWH BESS Meeting

27 Mar.,2025

This big project in central America.The customer will provide the transformer,and we will provide the panels, bracket, PCS, battery, container.The panels will be installed on the ground.Then power produced by the panels will be on grid,and extra will be stored in the battery.and The battery will sell the electricity on night.

 

Micro-grid Bess 
After many years practical experiences, we have established a suit project management system with customer-orientated and effect-orientated judgment standard with final marketing results.
This project will be installed in central America.

The panels are 5mw, and the PCS is 5mw, and the battery energy storage system is a total of 20MWH total of about 8 containers. We will use the liquid cooling system for the battery, which has more higher cooling efficiency. The container will have a built-in sound and light alarm device, hot aerosol fire extinguishing device, electrochemical fire extinguishing module, and triple protection to ensure that the cabinet is protected from the risk of electrical fire and re-ignition.

Programme: Panels:580w bifacial solar panels, and a C-shape bracket, on the ground, the Angle is 15 degrees and the height is 75cm. The PCS will use 2 pcs 2.5MW PCS, and use 8 40ft containers, each container is 2.5mwh.
The feactures of this 5MW 20MWH project
• High power (above MW level) independent microgrid, A  C bus topology to reduce the input source coupling, and improve reliability;
• The system operates under off-grid mode, with energy storage systems or diesel generators providing voltage and frequency support for the entire microgrid.
 